The United States Coast Guard is seeking a qualified individual or firm to replace a power breaker and trench a new electrical power feed at the USCG Cutter Chippewa moorings in Buchanan, TN. The scope of work includes replacing a 400-amp 3-phase power breaker, trenching approximately 500 feet, procuring and installing 500 feet of 4” schedule 80 conduit, and providing electric wire to be routed within the conduit run. The contractor must be certified in the state of Tennessee and comply with the most current edition of the National Electric Code. The project requires a special schedule to prevent operational interruptions during the installation process.
• The contractor shall locate and mark all private utilities before any excavation.
• The contractor shall procure and replace the power breaker with the same or a compatible model.
• The contractor shall provide terminations of all conductors at the power breaker and at the Ship’s Shore Tie platform.
• The contractor shall provide excavation and removal of pre-existing/damaged conduit and cable.
• The contractor shall restore/patch all disturbed surfaces to their original condition.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.