Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Alondra Blvd. Pavement Rehabilitation from Studebaker Rd…

City of Norwalk·California

Alondra Blvd. Pavement Rehabilitation from Studebaker Rd. to Gridley Rd. CIP 7921

Closes 7/14/2026$120k – $180kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Norwalk is soliciting bids for the Alondra Boulevard Pavement Rehabilitation (Project 7921), a street‑reconstruction effort that spans the corridor between Studebaker Road and Gridley Road. The work includes cold‑milling existing asphalt, reconstructing AC pavements, applying ARHM overlays, replacing curbs, gutters, sidewalks, ADA ramps, and coordinating utility adjustments, all within a tight seasonal window. The contract value is estimated at roughly $1.5 million, with a bid security of 10 % and a 40‑working‑day construction schedule once the Notice to Proceed is issued. • Scope: cold‑mill ≈ 181,000 SF, AC reconstruction (4‑in. & 10‑in.), ARHM overlay, concrete curb/sidewalk work, traffic‑control installation, utility coordination, SWPPP compliance. • Schedule: bid submission by 14 July 2026; field work must start after award and be completed within 40 working days, and all activity must finish by 30 Sept (seasonal window). • Requirements: CA Class A contractor’s license, DIR registration, 10 % bid bond, post‑award performance/payment bonds, full suite of insurance, prevailing‑wage compliance, detailed safety and environmental plans, and electronic submission via PlanetBids.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Isiah Corona

[email protected]

Key dates

Opened
5/29/2026
Questions due
7/7/2026
Closes
7/14/2026
Duration
40 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB No. 26-837

Budget estimate

$120,000 – $180,000

The IFB cites an estimated construction cost of about $1.5 million. Assuming a typical contractor net profit of 8‑12 % after labor, materials, bonds, and retention, the expected earnings for the prime contractor would fall roughly between $120,000 and $180,000. Profitability could vary with scope creep, change orders, or efficient scheduling that reduces overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The City of Anaheim·California

Top match · 70%

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

City of Laguna Hills·California

70% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

Miami-Dade County Department of Transportation and Public Works·Florida

70% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Vernon·California

70% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Ontario·California

69% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Illinois Tollway·Illinois

69% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Texas City of San Antonio·Texas

69% match

2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

Idaho Transportation Department·Idaho

68% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Texas City of San Antonio·Texas

68% match

2027 Street Rehabilitation Package 5 – Overlay

Closes 12/8/2026Opened 10/28/2026

City of Waco·Texas

68% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

California Department of Transportation·California

68% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

City of Miramar·Florida

68% match

Milling and Resurfacing of Miramar Parkway from SW 172 Ave to SW 184 Ave

Closes 11/19/2026Opened 10/22/2026

City of Charlotte·North Carolina

68% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of Santa Ana·California

68% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026

Texas City of San Antonio·Texas

68% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of El Paso De Robles·California

68% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

City of Rancho Palos Verdes·California

68% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026

City of San Antonio·Texas

68% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

68% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

Texas City of San Antonio·Texas

68% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

Illinois Tollway·Illinois

68% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

City of San Antonio·Texas

68% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of San Clemente·California

67% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

California Department of Transportation·California

67% match

Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd.

Closes 11/10/2026Opened 9/21/2026

City of Fargo·North Dakota

67% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026