The Fermi National Accelerator Laboratory (FNAL) is requesting proposals for the demolition, re-installation, and relocation of ducts and piping to allow for the future installation of the MAGIS-100 experiment in the MINOS Service Building. The project requires a subcontractor to furnish all labor, materials, tools, and equipment necessary to perform the work as described in the drawings and technical specifications. The subcontractor must have experience with plumbing, heating, and air conditioning systems, as well as electrical installation. The project includes milestones such as material submittals, completion of punch-list items, and construction completion.
• The subcontractor must have at least ten years of construction industry experience in the installation of plumbing piping systems, hydronic piping systems, compressed air piping systems, and air duct systems.
• The subcontractor must be NFPA 70E compliant and have experience with electrical installation of similar voltages.
• The subcontractor must have experience installing piping and/or other mechanical components at elevations greater than 30 feet.
• The subcontractor must provide a firm fixed price for the work and submit a technical proposal and a business management proposal.
• The subcontractor must comply with the Davis-Bacon Act, construction wages, and certified payroll requirements.