Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›TMT BERTH 5 PILE JACKET REPAIRS

Jacksonville Port Authority·Florida

TMT BERTH 5 PILE JACKET REPAIRS

Closes 3/18/2026$1.4M – $1.6MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Jacksonville Port Authority seeks a qualified contractor to repair and protect existing prestressed concrete piles at the Talleyrand Marine Terminal, Berth 5. The work includes full‑depth concrete jacketing, installation of cathodic protection (both embedded jacket anodes and supplemental bulk anodes), steel reinforcement repair, concrete removal and replacement, and comprehensive testing and commissioning of the corrosion‑control system. All work must comply with marine‑construction standards, environmental regulations, and JAXPORT safety/security protocols, and will be coordinated with ongoing port operations. • Remove spalled concrete (2‑4 in. beyond defect) and clean reinforcement using abrasive or high‑pressure water blasting. • Fabricate and install full‑depth cementitious jackets with embedded anodes, extending at least 3 ft below mean low water for designated piles. • Provide and commission a cathodic protection system, including bulk anodes, wiring, junction boxes, and post‑installation testing. • Deliver as‑built drawings, O&M manuals, warranty documents, and a one‑year performance verification report.

Attached files

Contact

Sandra Platt(Sr. Contract Specialist)

Sandra.Platt@JAXPORT.com

(904) 357-3017

Key dates

Opened
3/1/2023
Questions due
3/19/2026
Pre-bid meeting
3/16/2026
Site visit
3/16/2026
Closes
3/18/2026
Duration
270 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
ITB_C-1780

Budget estimate

$1,400,000 – $1,600,000

The engineer’s estimate for the project is $1,479,169.81, indicating a total contract value near $1.5 million. Including typical retainage (5 %), performance bonds, and potential change orders, the contractor can expect net earnings in the $1.4 M‑$1.6 M range. Factors influencing the final amount include the exact quantity of bulk anodes, any unforeseen site conditions, and the cost of specialized marine equipment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Jacksonville Port Authority·Florida

Top match · 71%

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

City of St. Petersburg·Florida

61% match

St. Petersburg Pier Pile Repairs

Closes 11/5/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

61% match

Replace, Nonskid Deck Covering on FWD 04 Level Weather Deck etc

Closes 11/17/2026Opened 10/28/2026

Jacksonville Port Authority·Florida

61% match

INTSALLATION OF NEW CRANE STOW PIN SOCKETS AT THE TALLEYRAND MARINE TERMINAL (TMT)

Closes 11/18/2026Opened 10/15/2026

Port of San Diego·California

60% match

STRUCTURAL REPAIRS AT NCMT BERTHS 24-3 AND 24-4, NATIONAL CITY

Closes 11/4/2026Opened 9/22/2026

U.S. Department Of Defense·United States of America

60% match

14--MECHANISM ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 12/10/2026Opened 9/11/2026

U.S. Department Of Defense·Pennsylvania

60% match

N0010427QX074

Closes 12/18/2026Opened 10/28/2026

Port of Tacoma·Washington

60% match

TOTE Terminal Pavement Maintenance and Repair (2026)

Closes 11/17/2026Opened 10/31/2026

U.S. Department Of Homeland Security·Mississippi

59% match

DRYDOCK REPAIRS FOR THE CGC PATOKA

Closes 11/6/2026Opened 10/23/2026

Massachusetts Department of Transportation·Massachusetts

59% match

616401 DISTRICT 5 Scheduled and Emergency Structural Repairs at Various Locations

Closes 11/17/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

59% match

PANEL,PATCHING,COMM

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

59% match

Support, Rev-01 (FO)~Well Deck Assessment

Closes 11/3/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

59% match

53--MOUNT,RESILIENT,WEA, IN REPAIR/MODIFICATION OF

Closes 11/9/2026Opened 9/10/2026

U.S. Department Of Homeland Security·Louisiana

59% match

DRYDOCK REPAIRS FOR THE CGC PAMLICO

Closes 11/16/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

58% match

PROPELLER,MARINE

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·North Carolina

58% match

Repair Auto Maintenance Facility Bldg 575 (230040)

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

58% match

MANIFOLD ASSEMBLY

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

CABLE ASSEMBLY SPEC

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·Minnesota

58% match

Duluth Vessel Yard Phase III Repairs

Closes 12/1/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

USNS CODY (T-EPF 14) MTA

Closes 11/18/2026Opened 10/20/2026

U.S. Department Of Defense·Pennsylvania

58% match

CYLINDER,PNEUMATIC,

Closes 12/14/2026Opened 9/15/2026

U.S. Department Of Defense·Hawaii

58% match

Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, Hawaii

Closes 11/10/2026Opened 6/23/2026