This project involves a comprehensive reconstruction of the Lower Tower parking lot and associated utility upgrades in Beaver Dam, WI. The scope includes removal and milling of existing asphalt, replacement of concrete curbs, gutters, and sidewalks, installation of new water mains, storm sewers, manholes, catch basins, pavement markings, lighting, and erosion‑control measures.
• Approximately 4,950 SY of parking‑lot resurfacing (≈1,145 tons of asphaltic pavement) with associated demolition of asphalt, concrete, curb, gutter, and sidewalk.
• Installation of new water distribution (≈360 LF of 10‑in. pipe, 145 LF of 12‑in. pipe) and storm‑drain infrastructure (≈346 LF of 12‑in. pipe, 96 LF of 18‑in. pipe) including valves, manholes, and catch basins.
• Additional work such as pavement markings, lighting, erosion‑control, and site cleanup; all quantities to be finalized on the bid form.
The City will accept bids exclusively through QuestCDN’s online electronic bid service (QuestvBid) and requires a 5 % bid security payable to the City.