Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Recuperator Press Modification Replacement

U.S. Department Of Defense·Alabama

Recuperator Press Modification Replacement

Closes 10/28/2026$1M – $3MRequest for Expression of Interest
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army is seeking innovative solutions to modify or replace the existing 60‑ton hydraulic recuperator press used in Building 133 at Anniston Army Depot, Alabama. The effort includes removal of obsolete components, installation of new load cells, integration of a closed‑loop pneumatic testing system, and optional automation such as robotic welding. All work must be performed on‑site, meet strict dimensional and accuracy tolerances, and comply with Buy‑American/Trade Agreements Act sourcing rules. The contract will run for up to a year and is expected to be awarded in FY 2027. • Replace/modify the 60‑ton hydraulic press with a system capable of 20,000 lb load testing and 250 psig pneumatic pressure, ±0.002 in measurement accuracy. • Provide four load cells, control panel display, data‑logging for ≥2,500 test reports, and optional robotic welding integration. • Must fit within a 180 × 120 in footprint, 115 × 115 in door clearance, and 174 in overhead clearance; foundation equivalent to 6‑in concrete. • Submit Phase 1 response by 28 Oct 2026; site‑visit optional on 14 Oct 2026; questions due by 19 Oct 2026.

Attached files

Contact

Zena Johnson(Contract Specialist)

[email protected]

(520) 669-6059

Key dates

Opened
9/28/2026
Questions due
10/19/2026
Site visit
10/14/2026
Closes
10/28/2026
Duration
12 months

Last updated

Details

Type
Request for Expression of Interest
Industry
Manufacturing
NAICS
333517
Solicitation №
W911KF-25-S-C002-A0017

Budget estimate

$1,000,000 – $3,000,000

The effort involves design, fabrication, installation, testing, and limited training for a complex hydraulic press system, likely requiring a small‑team of engineers, machinists, and project staff over 6‑12 months. Based on comparable defense‑industry equipment integration projects, a reasonable contract value would be in the low‑to‑mid‑single‑digit millions of dollars. Factors influencing cost include the need for specialized hydraulic components, load cells, control electronics, and possible robotic welding equipment, as well as travel and on‑site labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 63%

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

62% match

REGULATOR,AIR PRESS

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

TRANSMITTER,PRESSUR

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

60% match

PUMP,RECIPROCATING

Closes 11/2/2026Opened 10/27/2026

City of Branson·Missouri

60% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

60% match

TRANSMITTER,PRESSUR

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

59% match

16--NRP,CYLINDER,ACTUAT, IN REPAIR/MODIFICATION OF

Closes 11/8/2026Opened 9/23/2026

U.S. Department Of Defense·Oklahoma

59% match

RFP- FD20301901983_FA811824R0035 -0003 OH B2 ACTUATORS (Amendment -0003 )

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Defense·Alabama

59% match

Metal Forming Press Preventative Maintenance, Emergency Repairs and Parts

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

59% match

16--REGULATOR,AIR PRESS, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

59% match

TRANSMITTER,PRESSUR

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

59% match

48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 10/29/2026

Florida Keys Electric Cooperative Assn., Inc.·Florida

59% match

SPECIFICATIONS FOR THE PURCHASE OF MATERIALS FOR RECLOSER PROJECT

Closes 11/3/2026Opened 10/13/2026

New York City Department of Environmental Protection·New York

59% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

58% match

TRANSMITTER,PRESSUR

Closes 11/23/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

58% match

POWER SUPPLY

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

15--THRUST REVERSER SEC, IN REPAIR/MODIFICATION OF

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Georgia

58% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 9/29/2026

Metropolitan Council·Minnesota

58% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

58% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

58% match

59--NRP,PRINTE DBRD ASS, IN REPAIR/MODIFICATION OF

Closes 11/13/2026Opened 10/20/2026

City of Palo Alto·California

58% match

Refurbishment of Existing On Load Tap Changer at Adobe Creek Substation - AC21

Closes 11/3/2026Opened 10/15/2026

U.S. Department Of Defense·Georgia

58% match

Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)

Closes 11/25/2026Opened 4/29/2026

U.S. Department Of Defense·United States of America

58% match

58--RECEIVER-TRANSMITTE, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

57% match

BRUSHHOLDER OVERHAULED IN ACCORDANCE WITH SPEC S-4511

Closes 11/4/2026Opened 10/29/2026