Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Feasibility Study for Payload Processing Facility for…

National Aeronautics And Space Administration·Florida

Feasibility Study for Payload Processing Facility for Nuclear Operations

Closes 5/15/2026$500k – $2MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Aeronautics and Space Administration (NASA) is seeking a feasibility study for a payload processing facility (PPF) for nuclear operations. The study should provide a proposed approach to meet the statement of work, proof of location of the proposed built/potential facility, and a lease agreement or proof of ownership. The facility should be capable of supporting a Kennedy Space Center (KSC) / Cape Canaveral Space Force Station (CCSFS) to transport nuclear material by January 1, 2028. Key points to consider: • Proposed approach to meet the statement of work • Proof of location of the proposed built/potential facility • Lease agreement or proof of ownership • Price for the nuclear study per statement of work • Price for TAA with an international partner based on ESA/AirBus

Attached files

Contact

Allyson Grooms(Contract Specialist)

[email protected]

(321) 867-2304

Key dates

Opened
5/1/2026
Questions due
5/8/2026
Closes
5/15/2026
Duration
7 months

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
541990
Solicitation №
80KSC026Q0004

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is not explicitly stated in the document. However, based on the scope of work, which includes a feasibility study for a payload processing facility for nuclear operations, the budget could be substantial. Considering the complexity of the project and the expertise required, a reasonable estimate for the budget could be between $500,000 and $2,000,000. This estimate is based on the assumption that the study will require significant resources, including personnel, equipment, and facilities.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Florida

Top match · 70%

Draft Fair Opportunity Proposal Request (FOPR)

Closes 11/29/2026Opened 9/16/2026

U.S. Idaho Field Office·United States of America

70% match

RFI - DOE Infrastructure Work Scope Development

Rolling / TBD closeOpened 1/14/2016

U.S. Department Of Defense·Maryland

69% match

US Army assessment of Thermal Power Station Operations

Closes 12/26/2026Opened 1/20/2026

Northeastern Illinois University·Illinois

68% match

Request for Proposal: Micro Nuclear Reactor - Project Management Support

Closes 11/20/2026Opened 10/14/2026

U.S. Department Of Justice·Kansas

68% match

Pre-Solicitation Site Visit: Leavenworth Redundant Core Project

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·Virginia

68% match

Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)

Closes 11/2/2026Opened 9/18/2026

U.S. Department Of Defense·Arkansas

68% match

Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal

Closes 12/14/2026Opened 10/30/2026

U.S. Idaho Field Office·United States of America

68% match

RFI - DOE R

Rolling / TBD closeOpened 1/14/2016

New York State Energy Research and Development Authority·New York

67% match

Advanced Nuclear Request for Information

Closes 12/31/2026Opened 7/7/2025

U.S. Department Of Defense·District of Columbia

67% match

Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)

Closes 11/23/2026Opened 9/29/2026

Portage County·Wisconsin

67% match

Processing Environment for astatine-211 (At-211)

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·Florida

66% match

AFTAC Commercial Solutions Opening (CSO) 2024

Closes 4/24/2029Opened 4/25/2024

U.S. Department Of Defense·California

66% match

Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT

Closes 1/31/2027Opened 9/29/2026

U.S. Department Of Defense·California

66% match

Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT

Closes 1/31/2027Opened 8/27/2026

NYSERDA·New York

66% match

Engineering Services for the West Valley Site Management Program

Closes 12/3/2026Opened 10/30/2026

University of Wisconsin‑Madison·Wisconsin

66% match

Processing Environment for astatine-211 (At-211)

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Commerce·Maryland

66% match

Combined Synopsis/Solicitation for Spent Fuel Cell Shipment(s)

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·Wyoming

66% match

PKA Relocatable Facility

Closes 12/12/2026Opened 12/4/2025

U.S. Department Of Energy·New Mexico

66% match

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Fire Mitigation and Suppression System

Closes 12/19/2026Opened 6/19/2026