Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›ADA Dune Walkover at 7th Street

City of Mexico Beach·Florida

ADA Dune Walkover at 7th Street

Closes 1/16/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Mexico Beach is seeking bids for the construction of an ADA Dune Walkover at 7th Street. The project involves the construction of a walkover and related improvements to provide accessibility to the beach. The bid documents include construction plans and specifications. The city is looking for a contractor to perform the work, which includes the construction of a walkover, sidewalks, and pedestrian ramps. • The project requires the construction of a walkover and related improvements to provide accessibility to the beach • The bid documents include construction plans and specifications • The city is looking for a contractor to perform the work, which includes the construction of a walkover, sidewalks, and pedestrian ramps • The project is estimated to be completed within an unknown timeframe • The city has provided commodity codes for the project, including Duckboards and Boardwalks, Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps, and Construction, Vaulted Sidewalk

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Juli Danaher(Main Contact)

[email protected]

(850) 648-5700

Key dates

Opened
12/15/2025
Closes
1/16/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
ITB-2025-09-0-2025/JD

Budget estimate

$200,000 – $500,000

The budget for this project is not explicitly stated in the document. However, based on the scope of work, which includes the construction of a walkover, sidewalks, and pedestrian ramps, the budget could be estimated to be in the range of $200,000 to $500,000. This estimate is based on the assumption that the project will require significant construction work, including the installation of walkovers, sidewalks, and ramps, and may also involve site preparation and engineering services. The actual budget may be higher or lower, depending on the complexity of the project, the materials and labor required, and other factors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Missouri Department of Transportation·Missouri

Top match · 62%

NW District, City of Milan, Construction of a 6' wide ADA compliant sidewalk along Business Highway 5 with curb and gutter to accommodate pedestrian traffic from Richard's Supermarket to Casey's General Store.

Closes 11/13/2026Opened 10/20/2026

City of Ormond Beach - Purchasing Office·Florida

61% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

Alaska Department of Transportation and Public Facilities·Alaska

59% match

ITB NFHWY00962 FAST ADA Improvements - Fairbanks: 6th and 7th Avenues

Closes 11/17/2026Opened 10/27/2026

State of Connecticut Judicial Branch·Connecticut

59% match

ADA Improvements

Closes 12/17/2026Opened 10/30/2026

Idaho Transportation Department·Idaho

59% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Pasadena·California

58% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Murfreesboro·Tennessee

58% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

Massachusetts Town of Dennis·Massachusetts

58% match

IFB- ADA PORTABLE TOILETS WITH MAINTENANCE

Closes 12/4/2026Opened 10/28/2026

Maryland State Highway Administration·Maryland

58% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

San Bernardino County·California

58% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Helena·Montana

58% match

6th Ward ADA Ramps Project

Rolling / TBD closeOpened 3/11/2026

Georgia City of Sandy Springs·Georgia

58% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Broken Arrow·Oklahoma

58% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

Central Ohio Transit Authority (COTA)·Ohio

58% match

Pedestrian and Collision Avoidance – ADAS Pilot Program

Closes 11/16/2026Opened 10/14/2026

Miami-Dade County Department of Transportation and Public Works·Florida

57% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

Missouri Department of Transportation·Missouri

57% match

Central District, New Bloomfield, construction of ADA compliant sidewalk along Willow Drive and installation of RRFB at Route J school crossing

Closes 11/5/2026Opened 10/7/2026

Clark County·Nevada

57% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

57% match

STSRR PROJECT 21-7 STREETS IN TARA,OXFORD,SHERWOOD FOREST, DARRYL,BARD

Closes 11/3/2026Opened 10/6/2026

Virginia Department of Transportation·Virginia

57% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

State of Connecticut Judicial Branch·Connecticut

57% match

ADA Remediation Project

Closes 11/25/2026Opened 10/21/2026

County of Gadsden, FL·Florida

57% match

CR12 5th Avenue – Pedestrian Improvements

Closes 11/24/2026Opened 10/22/2026

City of Richmond·Virginia

57% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

City of Sandy·Utah

57% match

CITY HALL WEST STAIR REPLACEMENT, ADA RAMP & WEST/NORTH LANDSCAPE REDESIGN

Closes 11/6/2026Opened 10/23/2026

City of Richmond Government·Virginia

57% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Illinois DOT - Transportation·Illinois

57% match

FY 27 D1 BC 279170-040 Naperville 4 Stall Portable Restrooms

Closes 11/5/2026Opened 10/20/2026