Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Water and Wastewater
  5. ›Lift Station 4 and Pump Station 8 Rehabilitation

City of Flagler Beach·Florida

Lift Station 4 and Pump Station 8 Rehabilitation

Closes 9/30/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flagler Beach is seeking a contractor to rehabilitate two wastewater lift stations (Lift Station 4 at N. 20th Street and Pump Station 8 under the Lantana Avenue bridge). The work includes full demolition of existing internal components, structural repairs, new pump‑base installation, replacement of interior piping and valves, fabrication and installation of new access covers, concrete modifications, and all associated permitting, confined‑space entry, wet‑well cleaning, and safety compliance. Attendance at a mandatory pre‑bid meeting and site visit is required for bid responsiveness. • Demolition, structural repair, and installation of new pump and piping systems for two lift stations. • Required confined‑space entry, wet‑well cleaning, and procurement of all permits (ROW, utility, regulatory). • Mandatory pre‑bid meeting (Sept 15, 2026) and site visit to LS 04 and PS 08; attendance documented. • Contractor responsible for labor, materials, equipment, safety compliance, and all documentation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Penny Overstreet(Main Contact)

[email protected]

Key dates

Opened
9/1/2026
Pre-bid meeting
9/15/2026Mandatory
Closes
9/30/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
ITB-FB-26-0109-0-2026/PO

Budget estimate

$200,000 – $500,000

No budget is published, but similar municipal lift‑station rehabilitations typically range from $200,000 to $500,000 depending on site conditions, pump capacity, and concrete work required. Factors influencing cost include confined‑space entry safety measures, permitting fees, scope of structural repairs, and the need for new pump equipment. Therefore a reasonable estimate is between $200k and $500k for the complete scope.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Mandeville·Louisiana

Top match · 73%

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

City of Branson·Missouri

71% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of Lino Lakes·Minnesota

71% match

Lift Station #53 Rehabilitation

Closes 11/5/2026Opened 10/14/2026

City of Key West·Florida

71% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Gwinnett County Government·Georgia

71% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Louisiana City of Mandeville·Louisiana

70% match

LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/25/2026Opened 10/14/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

70% match

Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026

City of Hilliard, Ohio·Ohio

70% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Health And Human Services·South Dakota

69% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

Miami‑Dade County Water & Sewer Department·Florida

69% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

Gwinnett County Government·Georgia

68% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Gwinnett County Government·Georgia

67% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

League City·Texas

67% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

City of Orlando·Florida

67% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

City of Wilton Manors·Florida

67% match

Lift Station No. 4 Replacement

Closes 11/10/2026Opened 10/8/2026

Jackson County Utility Authority·Mississippi

67% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Village of Cary·Illinois

67% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

City of Laguna Beach·California

67% match

Old Top of the World Lift Station Rehabilitation - Phase II

Closes 11/10/2026Opened 10/9/2026

Brazos Valley·Texas

67% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Jefferson Parish Government·Louisiana

67% match

Bid Event #228 - Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026

City of Frazee, MN·Minnesota

67% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

City of Opa-locka·Florida

67% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

City of League City·Texas

67% match

Landing Blvd Lift Station Rehab WW1901F

Closes 11/3/2026Opened 10/2/2026

Town of Babylon·New York

66% match

BID# 26G53 - CONSTRUCTION OF AUXILIARY PUMP & PUMP STATION AT CELL 7

Closes 11/5/2026Opened 10/21/2026

City of Wilton Manors·Florida

66% match

Lift Station No. 7 Replacement

Closes 11/23/2026Opened 10/22/2026