Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›Fulweiler to Garfield Pipeline Replacement Project

Placer County Water Agency·California

Fulweiler to Garfield Pipeline Replacement Project

Closes 6/22/2026$1M – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Fulweiler to Garfield Pipeline Replacement Project involves the construction of a new water main in Auburn, California. The project includes the installation of ductile iron pipe, PVC pipe, and steel casing, as well as the removal and abandonment of old pipe. The contractor will be responsible for furnishing all labor, materials, taxes, equipment, and services necessary for the completion of the project. The project requires the contractor to work in accordance with the plans and specifications prepared by Hazen and Sawyer. Some key aspects of the project include: • Installation of 143 linear feet of ductile iron pipe in Fulweiler Avenue • Installation of 126 linear feet of ductile iron pipe encased in a 24-inch steel casing through Highway 49 • Installation of 1,163 linear feet of PVC pipe down a private alley and in Garfield Street • Nightwork for work within the Caltrans right-of-way • 12 private service connections • Installation of a new hydrant • Valving • Removal and/or abandonment of old pipe • Final pavement

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Stephanie Wens(Bid Contact)

[email protected]

(530) 823-4082

Key dates

Opened
5/19/2026
Questions due
6/8/2026
Pre-bid meeting
6/1/2026
Closes
6/22/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
2026-02

Budget estimate

$1,000,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and industry standards. The project involves the construction of a new water main, which includes the installation of ductile iron pipe, PVC pipe, and steel casing. The total length of the pipeline is approximately 1,432 linear feet. Assuming an average cost of $100 per linear foot for the installation of water mains, the total cost of the project would be approximately $1,432,000. However, this is a rough estimate and the actual budget may vary depending on various factors such as labor costs, equipment costs, and permits. A more realistic estimate would be between $1,000,000 and $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Redlands·California

Top match · 69%

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Anderson·South Carolina

67% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/14/2026

Eastern Municipal Water District·California

67% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

Gwinnett County Government·Georgia

67% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Anderson, SC·South Carolina

67% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

Gwinnett County Government·Georgia

66% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Tarrant Regional Water District·Texas

65% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

Gwinnett County Government·Georgia

65% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Gwinnett County Government·Georgia

65% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Edgewater, FL·Florida

65% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Georgia Gwinnett County·Georgia

65% match

BL152-26, Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Fargo·North Dakota

65% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Oregon Tualatin Valley Water District·Oregon

65% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Beaumont·California

65% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Bristol Virginia Utilities Authority·Virginia

65% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of Waukegan·Illinois

65% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

City of Douglas WY·Wyoming

65% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

Gwinnett County Government·Georgia

65% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

U.S. Department Of Defense·California

64% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

City of Charlotte·North Carolina

64% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

The Metropolitan Water District of Southern California·California

64% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

Gwinnett County Government·Georgia

64% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Transportation·Wyoming

64% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

City of Billings·Montana

64% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/1/2026