The project involves modifying the existing 14,000 square foot First Floor Level storage space and the existing Basement Floor Level space below to create manufacturing space on both floor levels. The scope of work includes dismantling and reinstalling the recessed steel framing floor structure, constructing new steel floor decking and a concrete slab floor system, and meeting subcontracting goals of 10% M/WBE. The construction duration is 180 calendar days with $750/day liquidated damages.
• Modification of existing storage space and basement floor level
• Creation of manufacturing space on both floor levels
• Dismantling and reinstallation of recessed steel framing floor structure
• Construction of new steel floor decking and concrete slab floor system
• Subcontracting goals of 10% M/WBE
• Construction duration of 180 calendar days with liquidated damages
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.