The US Army is seeking a contractor to provide a water softener system and maintenance services at Eglin AFB, FL. The contractor will be responsible for providing all necessary management, supervision, travel, tools, supplies, equipment, and labor to perform comprehensive maintenance. The system must include a duplex (two-tank) alternating configuration providing continuous, metered soft water 24/7, with automated, electronic meter-initiated control based on actual volumetric usage. The contractor must also provide on-site technical and preventive maintenance services, including technical assembly and inspection, operator training, and a 24-month service contract. Key features of the system include:
• Duplex system dimensions: 82" Width x 89" Height x 22" Depth
• Shipping Weight: ~1,140 lbs
• Max Operating Weight: ~2,510 lbs
• Brine subsystem with commercial brine tank and salt storage capacity of 1,200 lbs to 1,400 lbs
• Utilities and electrical requirements, including inlet/outlet pipe connections, drain connection, and electrical specifications
• Included component accessories, such as duplex integration kit, dual pressure gauge kits, and plumbing adapters
The contractor must also provide an initial salt delivery of at least 35 40-lb bags of high-purity water softener salt and a 24-month service contract, including scheduled routine inspection and testing visits and delivery and replenishment of salt.