Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Energy and Utilities
  5. ›New Sunshine Substation Battery Bank and Accessories

City of Gallup·New Mexico

New Sunshine Substation Battery Bank and Accessories

Closes 3/18/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Gallup, New Mexico is seeking competitive bids from qualified vendors for the supply and delivery of a complete DC battery system for the Sunshine Substation. The system shall support substation control, protection, and auxiliary power requirements and shall include batteries, charger, and battery rack with spill containment. The project includes manufacturing or procurement of specified equipment, factory assembly, packaging, handling, and transportation, and delivery to the City of Gallup Warehouse. The vendor shall provide the manufacturer's standard warranty for all equipment supplied under this scope of work. Key requirements include a battery bank with a nominal voltage of 125 Vdc, capacity of 150 Ampere-hours, and chemistry of Nickel-Cadmium (Ni-Cd), sealed recombinant type. The battery charger shall have an output current of 25 Amps, output voltage of 120 Vdc, and input power of 240 Vac, single-phase. The battery rack and spill containment system shall be sized and configured to accommodate the battery bank. • The system shall support substation control, protection, and auxiliary power requirements. • The system shall include batteries, charger, and battery rack with spill containment. • The vendor shall provide the manufacturer's standard warranty for all equipment supplied under this scope of work. • The battery bank shall have a nominal voltage of 125 Vdc, capacity of 150 Ampere-hours, and chemistry of Nickel-Cadmium (Ni-Cd), sealed recombinant type. • The battery charger shall have an output current of 25 Amps, output voltage of 120 Vdc, and input power of 240 Vac, single-phase. • The battery rack and spill containment system shall be sized and configured to accommodate the battery bank.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jose Romero(Purchasing Director)

[email protected]

(505) 726-6060

Key dates

Opened
3/6/2026
Questions due
3/10/2026
Closes
3/18/2026
Projected award
4/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
2211
Solicitation №
ITB-2616

Budget estimate

$100,000 – $500,000

The budget for this project can be estimated based on the cost of the equipment and services required. The cost of a complete DC battery system, including batteries, charger, and battery rack with spill containment, can range from $50,000 to $200,000, depending on the specific requirements and manufacturer. Additionally, the cost of labor, transportation, and other services may add to the overall budget. Therefore, a reasonable estimate for the budget would be between $100,000 and $500,000. The actual budget will depend on the bids received and the final contract award.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 64%

Solar Battery Replacements

Rolling / TBD closeOpened 5/31/2024

U.S. Department Of Defense·California

61% match

61--BATTERY,STORAGE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

SMT BATTERY

Closes 11/5/2026Opened 10/6/2026

Sweetwater Union High School District·California

60% match

District-Wide Uninterrupted Power Supply (UPS) Battery Replacement

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

60% match

CHARGER,BATTERY

Closes 11/20/2026Opened 10/21/2026

The University of North Carolina·North Carolina

60% match

Frank Porter Graham Student Union - Solar Array Expansion

Closes 11/3/2026Opened 10/8/2026

U.S. Department Of Veterans Affairs·California

59% match

6135--UPS Battery Replacement

Closes 11/13/2026Opened 10/22/2026

Connecticut City of Stamford·Connecticut

59% match

City Design Build RFP –Terry Conners Ice Rink Solar Photovoltaic (PV) & Battery

Closes 12/17/2026Opened 10/22/2026

Iowa State University·Iowa

59% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

61--BATTERY,STORAGE

Closes 11/1/2026Opened 10/20/2026

New York State Energy Research and Development Authority·New York

59% match

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

Ohio Department of Natural Resources·Ohio

59% match

PWC S. Construction Electric install new storage building 5TD0

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

59% match

BATTERY POWER SUPPL

Closes 11/23/2026Opened 10/26/2026

NYSERDA·New York

59% match

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

59% match

Engineer and Construct a Renewably Powered Battery-Coupled DC Fast Charging Network for the GVI, USV

Closes 11/5/2026Opened 10/7/2026

New York State Energy Research and Development Authority·New York

59% match

Affordable Solar and Storage Predevelopment and Technical Assistance

Closes 12/31/2029Opened 12/19/2024

U.S. Department Of Defense·Virginia

59% match

61--BATTERY ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 12/13/2026Opened 10/28/2026

NYSERDA·New York

58% match

NY-Sun Residential & Nonresidential Incentive Program

Closes 12/31/2030Opened 10/25/2018

U.S. Department Of Defense·Florida

58% match

61--BATTERY ASSEMBLY

Closes 11/1/2026Opened 10/22/2026

NYSERDA·New York

58% match

Affordable Solar and Storage Predevelopment and Technical Assistance

Closes 12/31/2029Opened 6/24/2020

City of Richland·Washington

58% match

Metalclad Switchgear - Sandhill Crane Substation Bank 3

Closes 11/3/2026Opened 9/27/2026

Education, NYS Dept. of·New York

58% match

NYSSD Electrical Panel Replacement

Closes 11/3/2026Opened 10/13/2026

Michigan Lansing School District·Michigan

58% match

SO-1862 Electrical Infrastructure/install chargers/bess

Closes 11/12/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

58% match

ENERGY STORAGE BANK

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of Defense·Ohio

58% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026