Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Del Rio and Delmar Sewer Extension Project

South Placer Municipal Utility District·California

Del Rio and Delmar Sewer Extension Project

Closes 10/15/2026$2.5M – $3.5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The South Placer Municipal Utility District is seeking sealed bids for the Del Rio and Delmar Sewer Extension Project in the City of Rocklin, CA. The contract covers the installation of approximately 3,225 ft of PVC gravity sewer mains, construction of sanitary sewer manholes, connection of new laterals to property‑line cleanouts, trenching, bedding, backfill, subgrade preparation, and restoration of asphalt pavement within the public right‑of‑way. All associated traffic control, water‑pollution control, and environmental protection measures are included. The work must be completed within 120 calendar days from the Notice to Proceed, and the estimated construction cost is $3.02 M. A 10 % bid bond, 100 % performance and payment bonds, and a 5 % retention are required. A non‑mandatory pre‑bid conference will be held on Sep 29, 2026 (in‑person and via Microsoft Teams). Bids are due Oct 8, 2026 at 2:00 PM. • Scope: PVC sewer main installation, manhole construction, lateral connections, trenching, backfill, pavement restoration. • Length: ~3,225 ft of 15‑inch gravity pipe (plus ancillary works). • Schedule: 120 calendar‑day construction period; bid deadline Oct 8, 2026 2 PM. • Required licenses: California Class A (General Engineering) contractor’s license; DIR registration; prevailing‑wage compliance. • Bonds & insurance: 10 % bid bond, 100 % performance & payment bonds, 5 % retention, required insurance certificates. • Pre‑bid conference: Sep 29, 2026 (9 AM on‑site, virtual option). • Estimated contract value: $3.02 M.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carie Huff(District Engineer)

[email protected]

(916) 786-8555

Key dates

Opened
9/17/2026
Pre-bid meeting
9/29/2026
Closes
10/15/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2026-01

Budget estimate

$2,500,000 – $3,500,000

The solicitation lists an estimated construction cost of $3,020,000. Assuming the District pays the contractor the full contract price less a 5 % retention (with the balance released upon final acceptance), the contractor’s net earnings would be roughly $2.9 M to $3.0 M. Minor variations could arise from change orders, differing subcontractor bids, or performance‑bond costs, so a reasonable range is $2.5 M – $3.5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Opa-locka·Florida

Top match · 67%

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

Maryland Wicomico County Government·Maryland

67% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/14/2026

Maryland Wicomico County Government·Maryland

66% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/15/2026

City of Pearland·Texas

66% match

Scarsdale Boulevard Sewer Extension

Closes 11/4/2026Opened 10/14/2026

Maryland Baltimore County Government·Maryland

66% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

County of York·Virginia

66% match

#B128260-GW Route 17 Sewer Extension

Closes 12/3/2026Opened 10/30/2026

Florida Governmental Utility Authority·Florida

66% match

Rio Vista Septic to Sewer

Closes 11/24/2026Opened 10/26/2026

City of Ponca·Oklahoma

66% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of Lynchburg·Virginia

66% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Brazos Valley·Texas

66% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Elgin·Illinois

65% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Alhambra·California

65% match

N2M26-94 SEWER MAIN REPLACEMENT PROJECT ON SIERRA VISTA AVENUE

Closes 11/5/2026Opened 10/8/2026

Georgia Twiggs County Board of Commissioners·Georgia

65% match

Exit 24 - Sanitary Sewer System Extension (SEID Grant)

Closes 12/1/2026Opened 10/28/2026

Wicomico County·Maryland

65% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/13/2026

City of Lynchburg·Virginia

65% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Martin County Purchasing·Florida

65% match

Port Salerno/New Monrovia Vacuum Sewer Collection System & Neighborhood Restoration

Closes 11/18/2026Opened 9/28/2026

Brazos Valley·Texas

65% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Mansfield·Texas

65% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

U.S. Department Of Defense·Illinois

65% match

FLOSSMOOR ROAD VIADUCT STORM SEWER IMPROVEMENTS, FLOSSMOOR, COOK COUNTY, ILLINOIS

Closes 10/15/2035Opened 10/15/2025

City of American Canyon·California

65% match

2026 Sewer Rehabilitation Project

Closes 4/1/2027Opened 9/17/2026

Fort Bend County Municipal Utility District No. 134A·Texas

65% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

Georgia City of Lagrange·Georgia

65% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Des Moines - Iowa·Iowa

65% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026