The Village of Hoffman Estates contracted the design‑build of a new sanitary‑sewer lift station at 1869 Hampton Road, including demolition of the existing structure, installation of a sub‑mersible pump system, new wet‑well, valve vault, generator pad, SCADA integration, and extensive civil works such as HDPE forceme, pipe replacement, and roadway restoration. The scope covers civil, mechanical, electrical, and environmental controls, with mandatory pre‑bid attendance, a unit‑price bid schedule, and numerous allowances for site‑clearing, SCADA, and utility fees. The contract is a unit‑price, full‑open competition award to Bolder Contractors, LLC for an estimated value near $1.9 million, with a 313‑day construction period and final completion slated for May 2027.
• Demolition, earthwork, and construction of concrete pads, wet‑well, and valve vault.
• Installation of HDPE forceme, sanitary and storm sewer pipelines, and associated valves and pumps.
• Electrical work including generator, automatic transfer switch, grounding, and SCADA system.
• Traffic control, erosion control, and site restoration (sodding, paving, curb‑gutter).