Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Construction
  5. ›PPRTA Digout & Patch

Awarded contract·City of Colorado Springs·Colorado

PPRTA Digout & Patch

Won by Trax +1 more$750kMultiple Award
Contract source

Awarded vendors

  • Trax
  • ESI

Description

This contract awards the City of Colorado Springs the “PPRTA Digout & Patch” project, a civil‑engineering effort to excavate (digout) and restore (patch) existing infrastructure, likely utility or roadway assets, within the PPRTA jurisdiction. The work is split between two contractors, Trax and ESI, each identified by internal contract numbers (T‑11086 and T‑11087). No monetary value is disclosed in the award notice, and the contract commences on January 1 2023. • Scope: Excavation, removal of existing material, and surface restoration (patching) of designated work zones. • Contractors: Two vendors share the award, suggesting a multi‑award or partitioned scope. • Timeline: Effective start date is 1 Jan 2023; no end date or renewal terms are provided.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
1/1/2023

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
R22-T163KK

Contract value

$750,000

The award notice does not disclose a contract value. A “digout & patch” project typically involves limited‑scope excavation and resurfacing, often ranging from a few hundred thousand to low‑million dollars depending on length of trench, depth, and pavement restoration requirements. Considering the municipal context, the likely scope is modest (e.g., a few miles of roadway or utility corridor). Based on comparable city projects of similar nature, a reasonable ballpark would be approximately $500,000 to $1,000,000. Choosing a midpoint yields an estimated contract value of roughly $750,000. This estimate assumes average labor rates, material costs for patching, and standard equipment usage without extraordinary site conditions.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Reno·Nevada

Top match · 61%

2027 Permanent Patch Program

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

59% match

PANEL,PATCHING,COMM

Closes 11/9/2026Opened 10/8/2026

City of Newton·Massachusetts

58% match

On-Call Utility Excavation & Repairs

Closes 11/12/2026Opened 8/31/2023

Illinois Tollway·Illinois

58% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

U.S. Department Of Defense·Pennsylvania

57% match

COMPUTER SYSTEM,DIG

Closes 11/2/2026Opened 10/1/2026

City of Shawnee·Kansas

57% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

U.S. Department Of Defense·United States of America

57% match

POWER DISTRO UNIT

Closes 11/23/2026Opened 10/15/2026

Ohio Department of Natural Resources·Ohio

57% match

PWC Dillon State Park Asphalt Patching

Closes 11/5/2026Opened 10/16/2026

Niagara Frontier Transit Authority (NFTA)·New York

57% match

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Homeland Security·Alabama

56% match

Gas Leak Repair, Valve Installation, and Asphalt Patching Services

Closes 11/4/2026Opened 10/29/2026

U.S. Department Of Defense·Rhode Island

55% match

COMPUTER SYSTEM,DIG

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

55% match

PWA DIFF MODE INDCT

Closes 11/2/2026Opened 10/19/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

55% match

DCR 903 Roadway Patch Materials

Closes 9/30/2028Opened 6/11/2023

U.S. Department Of Defense·Utah

55% match

Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Homeland Security·District of Columbia

55% match

Intrusion Detection System and Physical Access Control System upgrades

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

55% match

PWA PROFIBUS

Closes 11/16/2026Opened 10/19/2026

Henrico County Government·Virginia

55% match

ITB No. 26-3010-10EAR - Annual Contract for Paver Laid Full Depth Reclamation

Closes 11/4/2026Opened 10/6/2026

California Department of Transportation·California

55% match

Construct GSRD, DPPIA and install irrigation system.

Closes 12/8/2026Opened 10/19/2026

Calhoun County Board of County Commissioners·Florida

55% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

U.S. Department Of Transportation·Utah

55% match

UT NP DINO PMS(1), Pavement Preservation DINO

Closes 7/13/2028Opened 7/20/2026

City of Appleton, WI·Wisconsin

55% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Shawnee·Kansas

54% match

Resolution No. 2061

Closes 8/6/2030Opened 5/6/2025

Delaware Solid Waste Authority·Delaware

54% match

CHERRY ISLAND LANDFILL (CIL) AND PIGEON POINT LANDFILL (PPLF) MANHOLE REHABILITATION – PHASE 2

Closes 12/15/2026Opened 10/28/2026

South Dakota State Government·South Dakota

54% match

SD Multi-Hazard Mitigation Enhanced Plan Update

Closes 11/16/2026Opened 10/5/2026

El Dorado Irrigation District·California

54% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026