The City of Mobile is seeking a contractor to perform full “wet” demolition of two burned two‑story duplexes at the Berkshire Apartments site, including removal of foundations, footings, slabs, utility disconnection, and site restoration with erosion control, grading, top‑soil placement and reseeding. The work must be completed within 90 calendar days after a Notice to Proceed is issued, with liquidated damages of $250 per day for any delay. Bids were due December 17 2025, and the contract was awarded to CHRIS BREWER CONTRACTING INC. The solicitation required a 5 % bid bond (capped at $10 k), performance and labor‑material bonds for contracts ≥ $15 k, a City demolition contractor license, an Alabama General Contractor license for contracts ≥ $50 k, 15 % DBE participation, and E‑Verify enrollment. No contract value was disclosed.
• Scope: Complete wet demolition, foundation removal to 36 in., utility cap, dust/erosion control, grading, top‑soil spread, reseeding.
• Key dates: Pre‑bid conference Dec 8 2025; bid deadline Dec 17 2025; award expected within 60 days of opening.
• Compliance: Mandatory bid bond, performance bond, DBE utilization, E‑Verify, city business and demolition licenses, OSHA and local code adherence.