The contract is for the construction of approximately 12 acres of final cover, 3,100 linear feet of concrete-lined ditch, and 1,700 linear feet of storm drain piping at the Kiefer Landfill. The contract was awarded to Anderson Dragline, Inc. with a bid of $2,146,776.00. The project includes a pre-bid conference and walk-through, and the contractor is required to furnish all labor, materials, and equipment for the construction. The contract documents include specifications, drawings, and a CQA plan.
• The project requires the construction of final cover, concrete-lined ditch, and storm drain piping.
• The contractor must furnish all labor, materials, and equipment for the construction.
• The contract includes a pre-bid conference and walk-through.
• The contract documents include specifications, drawings, and a CQA plan.
• The contract was awarded to Anderson Dragline, Inc. with a bid of $2,146,776.00.