The contract is for the US-1 Beautification (Phase II) and Lighting project, which includes the construction of a 6’ wide sidewalk along US-1 and the installation of street light poles. The project length is approximately 2450 LF for the sidewalk and 3.1 miles for the lighting. The contract was rejected on November 26, 2013. Key features of the project include:
• Construction of a 6’ wide sidewalk along US-1
• Installation of 108 street light poles (Type 1) along US-1
• Optional installation of decorative light poles (Type 2)
• Pedestrian bridge, concrete flumes, and pedestrian railing
• Lighting conduit, pull boxes, and associated striping