The Alaska Industrial Development and Export Authority (AIDEA) issued RFP 21126 for geotechnical investigations and drilling to support the 211‑mile Ambler Access Project, a new gravel road from the Dalton Highway to the Ambler Mining District. The contract calls for a single‑prime contractor (or consortium) to deliver comprehensive geotechnical field work, frozen‑soil drilling, terrain mapping, and associated reporting, with the ability to operate in remote Arctic winter conditions. The performance period runs from June 2021 through December 2024, with field‑studies slated for summer 2022‑Fall 2023 and design phases extending into 2024. The solicitation emphasizes technical expertise (especially frozen‑soil drilling and Arctic operations), qualified Alaska‑registered engineering staff, and encourages minority‑business‑enterprise participation.
• Scope: Geotechnical investigations, frozen‑soil drilling, terrain mapping, and detailed reporting for a 211‑mile road corridor.
• Requirements: Alaska‑registered engineering lead, remote Arctic capability, MBE participation, and compliance with AIDEA’s insurance and licensing standards.
• Evaluation: Heavily weighted technical criteria (frozen‑soil drilling 15 % and Arctic operations 15 %) plus staff qualifications (15 %) and MBE/Alaska‑bidder preferences.