The contract is for the refurbishment of the upper roof at the Multnomah Building, with a mandatory pre-bid conference and prequalification requirements. The contract terms and conditions, project manual, and bidding pages are available for view and download on the Buyer Attachments page of the Sourcing Event. The preliminary tabulation of bids shows two bidders, Anderson Roofing and SNYDER ROOFING OF OREGON LLC, with bid amounts of $448,275.00 and $499,950.00, respectively.
• The contract requires the contractor to be Tremco-certified.
• The contract includes sustainable business practices, such as reusing, salvaging, or recycling waste materials and obtaining maximum utilization of State of Oregon certified MWESB firms.
• The contract has a payment term of 0% 0, Net 30.
• The contract has a commodity code of None Added.
• The contract has a description of Refurbish upper roof at the Multnomah Building.