The contract is for the construction of the Taylorsville State Office Building (TSOB) Generator Fuel System Upgrades. The scope of work includes replacing one existing diesel pump, changing the sequence of operation, adding an extra main tank fuel pump, replacing the controls system, and connecting the diesel system to the building automation system. The construction cost estimate is $125,000.00. Key points to consider include:
* The project requires a mandatory pre-bid meeting and site visit
* The bid documents are available on the Utah Public Procurement Place (U3P) website
* The project involves electrical system services, HVAC construction and maintenance, and mechanical installation and repair services
* The contract is for a specific project with a defined scope of work and construction cost estimate
* The contract may involve additional requirements, such as acknowledgement of DFCM general conditions and other policies
Attached files
The award documents live at the source — open the contract source above to download them.