The Kiefer Landfill On-Site Perimeter Road Rehabilitation project involves the rehabilitation and resurfacing of a 3/4-mile section of the existing 2-laned access road at the Kiefer Landfill. The project includes cold planing, tack coating, asphalt concrete, roadway excavation, aggregate base, traffic striping, and utility box adjustments. The contract was awarded to Western Engineering Contractors, Inc. for a total bid amount of $1,007,338.00. The project is necessary to continue providing landfilling access and green waste receiving and processing services at Kiefer Landfill.
• The project involves rehabilitation and resurfacing of a 3/4-mile section of the existing 2-laned access road.
• The contract includes various items such as cold planing, tack coating, asphalt concrete, roadway excavation, aggregate base, traffic striping, and utility box adjustments.
• The project is necessary to continue providing landfilling access and green waste receiving and processing services at Kiefer Landfill.
• The contract was awarded to Western Engineering Contractors, Inc. for a total bid amount of $1,007,338.00.