The contract is for ADA path of travel upgrades, which includes the furnishing of all labor, materials, equipment, transportation, and services necessary for removal and replacement of concrete sidewalk, concrete/asphalt walks, and parking. The estimated construction cost is $255,000, and the contractor's California license and/or class required is A or B. The contract was awarded to Central Valley Engineering & Asphalt, Inc. with a bid total of $231,344.00.
• The contract is for construction services
• The project location is 4137 Branch Center Road
• The estimated construction cost is $255,000
• The contractor's California license and/or class required is A or B
• The contract was awarded to Central Valley Engineering & Asphalt, Inc.