This contract calls for the supply and installation of a 15 kV arc‑resistant, metal‑clad switchgear system at the Bavarian Substation. The Chelan Public Utility District (Washington) issued the solicitation (23‑13196) and awarded the award to Crown Technical Systems at a bid of $1,328,697.68, which is slightly below the agency’s $1.4 M estimate. The procurement was conducted through a full and open competition, with an opening on May 30 2024. The work involves high‑voltage electrical equipment and will likely require coordination with the utility’s existing infrastructure.
• Scope: Provide and install 15 kV arc‑resistant, metal‑clad switchgear for a substation.
• Award: Crown Technical Systems (single‑award) at $1,328,697.68.
• Procurement: Full‑open competition; agency contact Minh Dang (509‑661‑4479, [email protected]).