The Pennsylvania State University commissioned a professional‑services feasibility study for the PlantWorks research complex, a multi‑disciplinary facility that will house USDA‑APHIS‑compliant greenhouses, labs, dry‑lab spaces, and public outreach areas. After a three‑stage A/E team selection (LOI, RFP, short‑list), Flad Architects was appointed to conduct the study, which includes site analysis, program development, conceptual design, preliminary budgeting, and phasing plans. Deliverables are to be completed by March 2024 and will support fundraising and subsequent design phases.
• Scope: program analysis, site selection, three conceptual planning scenarios, cost estimate, schedule, and high‑level graphics/3‑D sketches.
• Timeline: LOI May 5 2023 → RFP June 12 2023 → Short‑list June 27 2023 → Interviews July 28 2023 → Award August 25 2023 → Final report March 2024.
• Requirements: experience with research labs, USDA‑APHIS‑compliant greenhouse design, high‑performance building standards (ASHRAE 90.1‑2010, ASHRAE 189.1‑2011, minimum LEED Certified), and use of e‑Builder processes.