This contract involves providing labor, materials, and equipment for transmission and distribution line clearance, including pruning, cutting, treating, removing, and disposing of trees and brush. The project is located in Snohomish County, Washington, and covers approximately 18.3 pole miles. The engineer's estimate for the project is $244,000.00. Key aspects of the contract include:
• Prequalified work consists of providing all labor, materials, and equipment necessary for the project
• Total distance to be covered is approximately 18.3 pole miles
• Work is located in the vicinity of Arlington and Marysville, Snohomish County, Washington
• Contractors must be on the District's Small Works Roster and currently prequalified for Category D-1 – Right-of-Way (Tree and Brush Work) prior to bidding