Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maine guideMaine Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maine
  4. ›Civil Engineering
  5. ›Ferry Road Resiliency Project

Awarded contract·City of Saco·Maine

Ferry Road Resiliency Project

$5.5MSingle Award
Contract source

Description

The Ferry Road Resiliency Project is a municipal infrastructure effort for the City of Saco, Maine, whose bid‑opening summary was released on October 24 2025. Two contractors—Sargent and Wyman and Simpson—submitted fixed‑price proposals covering “City” and “MWC” (Metropolitan Water and Sewerage Commission) components, each providing a base bid and one alternate. No narrative scope, project specifications, award decision, contract term, or contact details are included in the provided documents, limiting the ability to assess the full work requirements or award outcome. • Two bidders submitted detailed financial proposals split between City and MWC funding streams. • Base‑bid totals amount to $3.9 million; total including alternates reach $5.5 million. • The documentation stops at the bid‑opening stage; no award, start‑date, or performance details are disclosed.

Attached files

Key dates

Bids closed
11/5/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237990

Contract value

$5,543,340

The bid summary aggregates all submitted amounts: total base bids (City + MWC) equal $3,900,769 and total including alternates reach $5,543,340.50. Since the contract has not been awarded, the actual contract value will likely be close to the total of the winning bidder’s base plus any selected alternates. Assuming the award goes to the lower‑priced bidder (Sargent) and that all alternates are accepted, the contract would be roughly $2,237,095.50. If the higher‑priced bidder (Wyman and Simpson) wins, the contract would be about $3,306,245.00. In the absence of an award, a reasonable estimate of the contract’s potential value is therefore in the $2–3 million range, with a ceiling of the aggregated total $5.5 million. I will use the highest plausible figure ($5,543,340) as a conservative upper‑bound estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Quonset Development Corporation·Rhode Island

Top match · 71%

RI Fast Ferry Site Work - Construction

Closes 11/17/2026Opened 10/28/2026

Maryland Town of Port Deposit·Maryland

69% match

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

New Orleans Regional Transit Authority·Louisiana

69% match

Ferry Transit Services

Closes 11/4/2026Opened 9/23/2026

New York City Department of Design and Construction·New York

68% match

CONSTRUCTION SERVICES FOR PROPOSED EAST SIDE COAST RESILIENCY PROJECT (ESCR)

Rolling / TBD closeOpened 6/7/2019

Environmental Conservation, NYS Department of·New York

68% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

Maryland Department of Transportation·Maryland

67% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

U.S. Department Of Transportation·Washington

67% match

WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8

Closes 9/24/2027Opened 9/24/2026

New York City Department of Parks & Recreation·New York

67% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

Sterling Heights·Michigan

67% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of Defense·Missouri

66% match

ODF-T FY26 Bledsoe Ferry Rehabilitation Project

Closes 10/31/2026Opened 8/31/2026

City of Ormond Beach - Purchasing Office·Florida

66% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

U.S. Department Of Transportation·Maine

66% match

Acadia National Park

Closes 11/10/2026Opened 10/9/2026

Ontonagon Valley Sportsmen's Club·Michigan

66% match

Ontonagon Valley Sportsmen's Club South Branch Ontonagon River Canoe Landing

Closes 12/18/2026Opened 9/26/2026

City of Brandon·Mississippi

66% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

Lewis County·Washington

66% match

Davison Rd MP 0.01 Bridge Rehabilitation

Closes 11/19/2026Opened 10/29/2026

California Grants·California

66% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

U.S. Department Of Transportation·Washington

66% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

Toledo - Lucas County Port Authority·Ohio

66% match

Remedial Action for Lower Maumee River Sway Bridge within the Maumee Area of Concern

Closes 12/8/2026Opened 10/29/2026

California Grants·California

66% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

U.S. Department of Homeland Security - FEMA·United States of America

66% match

Fiscal Year 2024 & 2025 Building Resilient Infrastructure and Communities (BRIC)

Rolling / TBD closeOpened 3/25/2026

City of Prior Lake·Minnesota

66% match

Lord's Street Bridge Rehabilitation Project

Closes 11/18/2026Opened 10/29/2026

Town of Waterford·Connecticut

66% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)

Closes 11/12/2026Opened 10/16/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Energy Resilience Construction Grants

Closes 12/1/2026Opened 8/26/2026