Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Maryland guideMaryland Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Maryland
  4. ›Engineering Services
  5. ›RFQ: Susquehanna River Road Corridor Safety, Shared-Use…

Maryland Town of Port Deposit·Maryland

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026$150k – $400kRequest for Qualification
Get bids like this by emailBid source

Description

The Town of Port Deposit, in partnership with the Wilmington Area Planning Council, seeks a multidisciplinary consulting team to develop a safety‑focused, context‑sensitive corridor study and 30% design for the Susquehanna River Road corridor, including safe vehicular, pedestrian, and bicycle access to the newly planned Hopkins Quarry Park and a shared‑use path to Octoraro Park. The effort will involve data collection, stakeholder engagement, crash analysis, alternative evaluation, environmental screening, and preparation of design packages that can transition to final engineering and construction if funding becomes available. • Conduct existing‑conditions inventory, crash analysis, and safety countermeasure identification for a 3.5‑mile corridor. • Engage local agencies, property owners, railroads, utilities, and the public through interviews, surveys, and advisory‑committee meetings. • Develop conceptual alternatives for park access, trailhead design, and a shared‑use path (riverfront vs. railroad‑side). • Produce a 30% design and basis‑of‑design package with cost estimates, phasing, permitting strategy, and implementation roadmap. • Prepare environmental documentation (NEPA categorical exclusion) and coordinate with MDOT, SHA, USACE, and other regulators. • Deliver final reports, GIS data, and presentation materials by June 30 2027, with optional follow‑on phases for 60%/90% design and full PS&E.

Attached files

Contact

Jamie Kendrick(Procurement Officer / Buyer)

[email protected]

(410) 378-2121

Key dates

Opened
10/16/2026
Questions due
10/30/2026
Pre-bid meeting
10/28/2026Mandatory
Closes
11/16/2026
Duration
2 years

Last updated

Details

Type
Request for Qualification
Industry
Engineering Services
NAICS
541330
Solicitation №
BPM059336

Budget estimate

$150,000 – $400,000

The solicitation lists a Project Cost Class of $100,000 to $500,000, which reflects the anticipated fee for the qualifications‑based selection and the Phase 1/Phase 2 scope (data collection, analysis, 30% design, and deliverables). Assuming a mid‑range fee structure (approximately 15‑30% of total project construction cost) and given the modest size of the corridor study, a reasonable estimate for the consulting award would be between $150,000 and $400,000. The lower end assumes a lean team and limited field work; the higher end accounts for extensive stakeholder coordination, environmental screening, and detailed 30% design packages.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Brunswick County·North Carolina

Top match · 82%

RFQ: Engineering Services for Highway 74 Parallel Force Main

Closes 11/23/2026Opened 10/22/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

82% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

81% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

80% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Fitchburg·Wisconsin

80% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Delaware Valley Regional Planning Commission·Pennsylvania

80% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

Maryland Department of Transportation·Maryland

80% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

Georgia Cobb County Department of Transportation·Georgia

80% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Lorain County·Ohio

79% match

RFQ - Design and Engineering Services

Closes 11/6/2026Opened 10/6/2026

Hamilton County, IN·Indiana

79% match

Public Safety Training Center Roadway and Levee

Closes 11/8/2026Opened 10/26/2026

Town of Bridgton·Maine

79% match

RFPs Requested – Willett Road Engineering Study

Closes 11/19/2026Opened 10/20/2026

Connecticut Department of Transportation·Connecticut

79% match

RFP - Technical Proposal - Quinebaug River Trail in the Town of Plainfield

Closes 11/13/2026Opened 9/9/2026

Town of Bridgton·Maine

79% match

Request for Proposals - Willett Road Engineering Study

Closes 11/19/2026Opened 10/26/2026

State of Delaware DOT·Delaware

79% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Massachusetts Town of Spencer·Massachusetts

79% match

Engineering Peer Review Proposals

Closes 12/3/2026Opened 10/30/2026

Georgia Bulloch County Board of Commissioners·Georgia

79% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

City of Fairlawn·Ohio

79% match

Smith Road SRTS – Fairlawn (PID 120279)

Closes 11/9/2026Opened 10/16/2026

Texas Midwestern University·Texas

79% match

RFP Tunnel Surface Improvement Project

Closes 11/12/2026Opened 10/14/2026

Bartow Airport Authority·Florida

78% match

RFQ – Industrial Park Revitalization Plan

Closes 12/1/2026Opened 10/22/2026

Georgia Henry County Board of Commissioners·Georgia

78% match

(RFQ) 27-23, Engineering and Design Services for Gardner Road Bridge

Closes 11/19/2026Opened 10/22/2026

Camden County·New Jersey

78% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Fargo·North Dakota

78% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

Sterling Heights·Michigan

78% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

U.S. Department Of The Interior·Colorado

78% match

Y--Pre-Proposal Site Visit

Closes 5/27/2027Opened 5/28/2026

County of Dorchester, SC·South Carolina

78% match

Ashley River Scenic Blue Trail Obstruction Clearing

Closes 11/5/2026Opened 9/23/2026