The contract is for the replacement of equipment at Well 13, which includes a pump, submersible motor, column pipe, variable frequency drive, and performance of a step-rate pump test to determine aquifer characteristics. The well is primarily used for raw water sales to the Golf Club at Red Rocks. The engineer's estimate for the project is $325,000.00, and the base bid received was $330,000.00.
• The project involves replacement of equipment at Well 13.
• The equipment includes a pump, submersible motor, column pipe, and variable frequency drive.
• A step-rate pump test will be performed to determine aquifer characteristics.
• The well is primarily used for raw water sales to the Golf Club at Red Rocks.
• The engineer's estimate for the project is $325,000.00.
• The base bid received was $330,000.00.