Oregon State University is renovating Halsell Residence Hall by replacing its roof, repainting the exterior, refreshing interior finishes, installing new resident‑room flooring and window coverings, and adding an owner‑provided water heater. The work is limited to the university campus building envelope and interior finish upgrades and is to be performed by a contractor that is already part of OSU’s 2019‑2023 Construction‑Related Services Reserve Program. The solicitation was a competitive Invitation to Bid with a firm‑fixed‑price structure, and the contract will be subject to Oregon prevailing‑wage requirements, public‑works bonding, and equity‑subcontracting obligations.
• Scope: full roof replacement, exterior painting, lobby and lounge interior refresh, flooring replacement, window‑covering installation, and water‑heater installation.
• Procurement: competitive ITB (full open competition) limited to pre‑qualified reserve‑program firms; award to Fortis Construction, Inc. at a base bid of $1,070,700.
• Requirements: OSU prevailing‑wage statutes, 100 % performance and payment bonds (unless price ≤ $150 k), insurance, background checks, and compliance with campus safety and non‑discrimination policies.