The City of Olathe, Kansas, has awarded a contract for the storm sewer rehabilitation of 124th Terrace between 124th Street and 124th Circle. The contract includes the demolition and disposal of existing structures, the installation of new precast concrete boxes, concrete pipe liners, and other related work. The contract was awarded to Cohorst Enterprises, Inc. for a total amount of $87,081.00. The project involves the construction of 1 each 12' x 5' curb inlet, 1 each 13' x 5' curb inlet, 48 lineal feet of precast 6' x 4' RCB, 195 lineal feet of 3" concrete pipe liner, and other related items. The project also includes pavement repair, pavement patching, and the installation of a wood picket fence, concrete sidewalk, and water service line.
• The contract includes the demolition and disposal of existing structures.
• The installation of new precast concrete boxes, concrete pipe liners, and other related work.
• The construction of 1 each 12' x 5' curb inlet, 1 each 13' x 5' curb inlet, 48 lineal feet of precast 6' x 4' RCB, 195 lineal feet of 3" concrete pipe liner, and other related items.
• Pavement repair, pavement patching, and the installation of a wood picket fence, concrete sidewalk, and water service line.