The 124th Monopole Replacement Project involves the replacement of a lattice tower with a 230KV transmission monopole. The project includes clearing and grubbing, removal of structures and obstructions, traffic control, grading, and other related work. The engineer's estimate for the project is between $1.25 million and $1.45 million. The contract was awarded to Potelco, Inc. with a total bid amount of $1,636,761.48.
• The project requires the removal of the existing lattice tower and the installation of a new 230KV transmission monopole.
• The project includes traffic control, grading, and other related work.
• The engineer's estimate for the project is between $1.25 million and $1.45 million.
• The contract was awarded to Potelco, Inc. with a total bid amount of $1,636,761.48.
• The project is located in Bellevue, Washington.