The contract is for the design and installation of a downspout and gutter replacement project at Topeka High School. The project includes the replacement of downspouts, gutters, and roof scuppers, as well as the removal and replacement of small sections of roofs. The contract was awarded to JB Turner & Sons Roofing for $93,977.00. The scope of work includes the design and installation of the downspout and gutter system, as well as the removal and replacement of existing materials. The project is expected to be completed within a certain timeframe, although the exact duration is not specified in the document.
• The contract includes a base bid and several alternate bids for additional work.
• The contract requires the contractor to provide a pre-construction lump sum fee of $5,000.00 to cover the costs of additional architectural/engineering design services.
• The contract includes an allowance of $15,000.00 for unforeseen conditions found during the progress of the work.
• The contract was awarded through a competitive bidding process, with multiple vendors submitting bids.
• The contract is subject to the terms and conditions outlined in the bid document, including the scope of work, payment terms, and contract duration.