The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the UVU Campus Wide Restroom Upgrade PH2 Abatement project. The project involves the remodel of restrooms at the UVU Orem campus in the BA and EN buildings, with the base bid including the abatement of lead tile in each restroom. The construction cost estimate is $50,000.00.
• The project is located at the UVU Orem campus in the BA and EN buildings.
• The base bid includes the abatement of lead tile in each restroom.
• A mandatory pre-bid meeting and site visit were held on October 3, 2024.
• The bid documents were made available on the DFCM website on September 26, 2024.
Attached files
The award documents live at the source — open the contract source above to download them.