The contract is for the rehabilitation of the Oak Shores Effluent Pump Station. The project involves replacing the wet well with one that is sized appropriately for current and future needs, and replacing the degraded inlet structure. The engineer's estimate for the project is $151,000. The contract was awarded to two vendors, Hartzell General Engineering, Contractor, Inc. and Spiess Construction Co., Inc. The base bid subtotal for Hartzell General Engineering, Contractor, Inc. is $566,850.00, and the base bid subtotal for Spiess Construction Co., Inc. is $588,500.00.
• The project includes mobilization, existing wet well demo and disposal, excavation, shoring, precast wet well, concrete pump pedestals, field formed, station piping, backfill, foundation and pipe supports, electrical, signal and chem restoration, pumps re-install and test, and site cleanup/punch list.
• The contract also includes an additive bid item for inlet structure replacement, with a unit price of $27,500.00 for Hartzell General Engineering, Contractor, Inc. and $96,200.00 for Spiess Construction Co., Inc.
• The total bid for Hartzell General Engineering, Contractor, Inc. is $594,350.00, and the total bid for Spiess Construction Co., Inc. is $684,700.00.