Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Alderwood Mall Parkway Projects

Awarded contract·Snohomish County·Washington

Alderwood Mall Parkway Projects

Won by Kamins Construction Inc.$550kAwarded 3/4/2020Single Award
Contract source

Awarded vendors

  • Kamins Construction Inc.

Description

This contract awards Kamins Construction Inc. the right to perform comprehensive heavy‑civil construction for the Alderwood Mall Parkway Projects in Snohomish County, Washington. The work includes site preparation, clearing and grubbing, demolition of existing structures, earthwork (roadway excavation and grading), utility installation (storm‑sewer pipe), concrete curb & gutter, sidewalk and driveway construction, hot‑mix asphalt paving, traffic control devices, signage, fencing, erosion control, and final site restoration. The solicitation was issued on 22 January 2020, bids were due 11 February 2020, and the contract was awarded on 4 March 2020. The award follows a full‑open competitive process and requires a 5 % bid bond. The estimated engineering cost is $548,000, indicating a mid‑six‑figure contract. • Scope: Full design‑build civil works (earthwork, utilities, paving, traffic control). • Vendor: Kamins Construction Inc., a Washington‑based contractor. • Procurement: Full and open competition with a 5 % bid‑bond requirement.

Attached files

Key dates

Bids closed
2/11/2020
Intent to award
3/4/2020
Awarded
3/4/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
PW-002-20SR

Contract value

$550,000

The solicitation lists an engineer’s estimate of $548,000. Competitive bids on similar municipal roadway projects in the region typically range from 90 % to 110 % of the estimate. Assuming the winning bid was close to the estimate, a reasonable ball‑park value is roughly $550,000. This includes all unit‑price items (site work, utilities, concrete, asphalt, signage, etc.) and accounts for the required 5 % bid bond, which would be about $27,500. No explicit contract total appears in the PDFs, so the estimate relies on the published engineer’s estimate and typical bid‑to‑estimate ratios for public‑works road projects.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Transportation·Mississippi

Top match · 65%

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

City of Charlotte·North Carolina

65% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of Charlotte·North Carolina

64% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

Bluewing Civil Consultants, LLC.·Louisiana

64% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

Lee's Summit R-7 School District·Missouri

63% match

Greenwood Elementary School Public Improvements Project

Closes 11/10/2026Opened 10/22/2026

Georgia Bulloch County Board of Commissioners·Georgia

62% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

Los Angeles County Public Works·California

62% match

RMDJOC6790 Parkway Concrete Maintenance, MD 2

Closes 11/10/2026Opened 10/13/2026

City of Pueblo·Colorado

62% match

Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2

Closes 11/17/2026Opened 10/27/2026

City of Lancaster·Texas

62% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

Massachusetts City of Brockton·Massachusetts

62% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Charlotte·North Carolina

62% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Northern Virginia Parks·Virginia

62% match

Algonkian 2027 Golf Course Renovations Project Manual

Closes 11/12/2026Opened 10/8/2026

Harris County Municipal Utility District No. 538·Texas

61% match

FM 529 Turn Lane, Traffic Signalization, and Driveway

Closes 11/5/2026Opened 10/20/2026

City of Ridgeland·Mississippi

61% match

West Jackson Street Corridor Demonstration Project

Closes 11/6/2026Opened 10/16/2026

Camden County·New Jersey

61% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Fort Wayne·Indiana

61% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

Texas Houston-Galveston Area Council·Texas

61% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

City of Charlotte·North Carolina

61% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Miramar·Florida

61% match

Milling and Resurfacing of Miramar Parkway from SW 172 Ave to SW 184 Ave

Closes 11/19/2026Opened 10/22/2026

City of Charlotte·North Carolina

61% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Charlotte·North Carolina

61% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

City of Brandon·Mississippi

61% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

City of Columbus·Ohio

61% match

Roadway - N Knot - 315 at Lane Avenue

Closes 11/4/2026Opened 10/2/2026

City of San Antonio·Texas

61% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Houston-Galveston Area Council·Texas

60% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026