The City of Bellevue has awarded a contract for the SE 38th St at Factoria Blvd SE Street Improvement project. The project involves removing and replacing channelization, signal mast arms, and signal heads, as well as other miscellaneous work. The contract was awarded to Watson Paving Co., Inc and Westwater Construction Co. The bid tabulation provides a detailed breakdown of the costs associated with each item.
• Remove and replace channelization to add a new right-turn pocket
• Remove and replace signal mast arms and signal heads
• Remove and replace signal induction loops and miscellaneous work
• Construction surveying, flaggers and other traffic control labor, traffic control supervisor, and construction signs
• HMA Cl. 1/2" Pg58h-22, planing bituminous pavement, inlet protection, erosion control and water pollution prevention, and street cleaning
• Raised pavement markings, traffic signal system, removing plastic traffic markings, induction loop marker, plastic traffic arrow, and plastic crosswalk line