The Boysen Water Distribution System Rehabilitation Project at Boysen State Park involves the rehabilitation of the water distribution system. The project was awarded to Copper Creek Construction with a base bid of $366,938.00 and an alternate bid of $2,100.00. The contract documents include a bid bond response information form, addenda, and other relevant documents. The project requires the contractor to rehabilitate the water distribution system, with the goal of improving the overall functionality and efficiency of the system. Key aspects of the project include the replacement of existing infrastructure, the installation of new pipes and fittings, and the testing and commissioning of the rehabilitated system. The contractor is responsible for ensuring that all work is completed in accordance with the contract documents and applicable laws and regulations.
• The project is located at Boysen State Park in Wyoming.
• The contract was awarded on May 2, 2018.
• The project involves the rehabilitation of the water distribution system.
• The contractor is responsible for replacing existing infrastructure and installing new pipes and fittings.
• The project requires the testing and commissioning of the rehabilitated system.
• The contractor must ensure that all work is completed in accordance with the contract documents and applicable laws and regulations.