This contract calls for the complete nuisance abatement and demolition of all structures located at 2721 Harper Avenue, Mobile, AL. The work must be performed using wet‑demolition methods, include utility capping, comprehensive site clearing, erosion‑ and sediment‑control measures, hazardous material handling, and final site restoration with seeding and mulching. The contractor is required to submit all necessary documentation, maintain insurance, and comply with federal, state, and local environmental regulations.
• Wet demolition of structures, footings, slabs, and all debris, with LBP/ACM disposal included in the bid.
• Utilities must be disconnected and capped; temporary BMPs installed; permanent stabilization completed before departure.
• Contractor must provide proof of E‑Verify enrollment, insurance certificates, and close‑out documents; $250/day liquidated‑damage applies after a 15‑day completion window.