This contract concerns the repair, replacement, and rehabilitation of concrete pavement along County KK (E. Calumet Street) between State Trunk Highway 441 and Coop Road in Appleton, Wisconsin. The scope includes demolition of existing concrete sections, installation of new concrete pavement and joint systems, curb and gutter work, side‑walk removal, utility protection, traffic‑control device provision, and extensive marking/striping. All work must comply with the 2025 WisDOT Standard Specifications, and the contractor must provide detailed traffic‑control plans, maintain required insurance coverages, and meet WisDOT pre‑qualification criteria.
• Demolition and removal of existing concrete pavement, curbs, gutters, and sidewalks (e.g., 33 SY of pavement, 198 LF of curb/gutter).
• Installation of new concrete pavement, high‑early‑strength concrete repair/replacement, drilled tie and dowel bars, and associated joint work (total ~1,300 SY of concrete work).
• Traffic‑control, marking, and utility‑coordination services, including drums, barricades, warning lights, and epoxy striping, with a maximum 45‑day lane‑closure window.
• Strict insurance and indemnity requirements (minimum $1 M coverage per policy) and WisDOT pre‑qualification, plus bond requirements (10 % bid bond, 100 % performance bond).