The 2021 Grinder Pump Replacement Program is a project that involves the installation of new grinder pump assemblies, float switches, control panels, junction boxes, electrical conduit, and restoration of 14 sites along East Lake Sammamish Shore Lane NE, East Lake Sammamish Shore Lane SE, East Lake Sammamish Parkway SE, East Lake Sammamish Place SE, and SE 4th Street. The project is located within the City of Sammamish, King County, Washington. The engineer's estimate for the project is $141,000. The contract was awarded to Westerlund Excavation, with a total bid of $169,278.75.
• The project involves the replacement of grinder pumps at 14 sites.
• The project is located in the City of Sammamish, King County, Washington.
• The engineer's estimate for the project is $141,000.
• The contract was awarded to Westerlund Excavation.
• The total bid amount for the contract is $169,278.75.