The Traffic Signal Upgrades Project (HSIP Cycle 6) involves the installation of conduit and pullboxes for fiber optic cable, replacement of traffic signal controller cabinets, and installation of fiber optic cable and appurtenances. The project has an estimated construction cost of $396,700. The contract was awarded to Tim Paxin's Pacific Excavation, Inc. in the amount of $389,905.00. Key aspects of the project include:
• Installation of conduit and pullboxes for fiber optic cable
• Replacement of traffic signal controller cabinets
• Installation of fiber optic cable and appurtenances
• Estimated construction cost: $396,700
• Contract award amount: $389,905.00