Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›FPM - Old Main-3rd Floor Dance Studio 2nd Rebid

Awarded contract·Wayne State University·Michigan

FPM - Old Main-3rd Floor Dance Studio 2nd Rebid

Won by Shock Brothers$500kSingle Award
Contract source

Awarded vendors

  • Shock Brothers

Description

The contract concerns the renovation of two dance studios on the third floor of Wayne State University’s historic Old Main building. The scope includes demolition of existing sub‑floors, installation of new engineered sub‑floors, shock‑absorbing pads, high‑performance hardwood strip flooring in Studio 3372 and hard‑wear vinyl in Studio 3374, with matching vented bases and transition strips. Work must be performed in an occupied building, adhere to university wage‑rate requirements, provide certified payroll, and meet a $150/day liquidated‑damages clause for delays beyond the November 30, 2023 substantial‑completion deadline. The award was made to Shock Brothers, a bonded contractor capable of delivering a lump‑sum price for the entire project. • Interior demolition, sub‑floor construction, and specialty dance‑studio flooring (maple strip and Harlequin vinyl). • Mandatory pre‑bid conference attendance; bid submission due 6 Dec 2023; performance bond required. • Compliance with WSU wage schedule, certified payroll, smoke‑free campus policy, and a $150/day liquidated‑damages provision.

Attached files

Key dates

Bids closed
12/6/2023
Ends
11/30/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
001-404927

Contract value

$500,000

No explicit contract value appears in the provided documents. Based on the scope—approximately 2,270 sf of maple strip flooring and 1,500 sf of vinyl flooring, plus demolition, sub‑floor construction, padding, transition strips, and associated labor—the total cost is likely in the range of $450 k to $600 k. Assuming an average unit cost of $120 per sf for hardwood work and $100 per sf for vinyl work, plus sub‑floor and pad costs, the estimate converges around $500,000. This figure also aligns with the bid‑bond threshold (5 % of the bid) indicating the contract is expected to exceed $50,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Massachusetts Watertown Housing Authority·Massachusetts

Top match · 62%

FISH 321113

Closes 11/12/2026Opened 10/20/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

61% match

Rental of LED Floor for Annual Christmas Party

Closes 11/2/2026Opened 10/27/2026

City of Redlands·California

61% match

REBID: Fire Station 263 Bathroom Remodel

Closes 11/10/2026Opened 10/26/2026

Corrections and Community Supervision, NYS Dept. of·New York

61% match

Repair Cooler Floor

Closes 11/5/2026Opened 10/15/2026

The University of North Carolina·North Carolina

61% match

New Residence Hall 1 - Full Building Round 2-Revised

Closes 11/12/2026Opened 10/13/2026

University of South Carolina·South Carolina

61% match

REBID School of Music- Renov to Recording Studio

Closes 11/10/2026Opened 10/21/2026

The University of North Carolina·North Carolina

61% match

New Residence Hall 1 - Full Building Round 2

Closes 11/12/2026Opened 10/13/2026

State University of New York (SUNY)·New York

60% match

Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

City of St. Cloud·Florida

60% match

City Hall 3rd Floor Renovations

Closes 11/19/2026Opened 10/4/2026

Massachusetts Town of Westborough·Massachusetts

60% match

RFQ General and FSB Contractor for New Dispatch Facility

Closes 11/4/2026Opened 10/23/2026

Oregon Department of Corrections·Oregon

60% match

Two Rivers Correctional Institution Kitchen Floor Replacement

Closes 11/10/2026Opened 8/19/2026

NYS Wayne County Regional Land Bank·New York

59% match

RFP- 36-40 Canal Street Interior Renovations

Closes 11/19/2026Opened 10/28/2026

City and County of Denver·Colorado

59% match

RFP: Boettcher Concert Hall Renovation CM/GC

Closes 12/2/2026Opened 10/22/2026

Sterling Heights·Michigan

59% match

Sterling Heights Senior Center Kitchen Renovation

Closes 11/17/2026Opened 10/26/2026

U.S. Department Of Defense·California

59% match

163rd CE Flooring & Painting 2272

Closes 11/6/2026Opened 10/27/2026

Fox Valley Technical College·Wisconsin

59% match

Flooring Replacement – AG137 - REBID

Closes 11/13/2026Opened 10/30/2026

NYS The M-ARK Project Inc·New York

59% match

NYMS Fleischmanns 973 Main Street

Closes 11/16/2026Opened 10/23/2026

People with Developmental Disabilities, NYS Office for·New York

59% match

Rush IRA - Kitchen Renovation

Closes 11/27/2026Opened 10/28/2026

Massachusetts Town of Andover·Massachusetts

59% match

Re-Bid Andover Town Offices Phase 3, FSB Fire Protection Only, IFB 185/015/27

Closes 11/12/2026Opened 10/28/2026

City of Frazee·Minnesota

59% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

The University of North Carolina·North Carolina

59% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

NYS The M-ARK Project Inc·New York

59% match

NYMS Fleischmanns 1050

Closes 11/23/2026Opened 10/30/2026

City of Chapman·Kansas

59% match

Downtown Dance, Tumbling & Aerial Arts

Closes 11/10/2026Opened 10/10/2026

East Brunswick Public Schools·New Jersey

59% match

Kitchen and Multipurpose Room Renovations at Warnsdorfer ES

Closes 11/20/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·California

59% match

Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring

Closes 11/12/2026Opened 10/13/2026