The City of Sebring is seeking a contractor to construct a connection of the Hammock Mobile Estates sewage collection system to the City of Sebring sewage collection system. The project includes the lining and upgrading of an existing lift station, the cleaning and decommissioning of an existing wastewater plant, and the disposal of the plant's tanks. The contractor will also be required to fill the holes left by the percolation ponds and tank removal and sod the area with Bahia sod. The contract was awarded to Excavation Point in the amount of $121,721.00.
• The project includes the construction of a connection of the Hammock Mobile Estates sewage collection system to the City of Sebring sewage collection system.
• The existing lift station will be lined and upgraded for use in the connection.
• The existing wastewater plant will be cleaned of existing liquids and solids, decommissioned, dismantled, and the tanks disposed of legally and properly.
• The holes left by the percolation ponds and tank removal shall be filled to the grade specified and the area sodded with Bahia sod.