The contract is for the replacement of culvert pipes at thirty locations throughout the City of Palm Bay's Port Malabar Unit 42. The project includes the removal, disposal, re-installation, and restoration of the culvert pipes, as well as utility relocations and restoration work. The contractor is responsible for coordinating with utility owners and relocating City water utility pipes if necessary. The contract also includes a pre-construction video to document existing conditions and a final as-built verification by a professional licensed surveyor.
• The project is a turnkey project, meaning the contractor is responsible for all aspects of the project.
• The contractor must follow the manufacturer's specifications and recommendations, as well as the City of Palm Bay's requirements and the Florida Department of Transportation's standard specifications.
• The contractor must verify pipe inverts prior to placement of asphalt and provide field verification to the Public Works Engineering Inspector.
• The contractor is responsible for pot-hole digging to verify utility depths and separation distance to the replacement stormwater pipes.