The Davis Road Culvert Replacement Project requires the removal and replacement of existing culverts along Davis Road in Spartanburg County, SC, combined with associated roadway paving, driveway tie‑ins, traffic‑control installation, and utility coordination. The contract is a unit‑price bid with a 10 % retainage, a one‑year warranty, and a performance period of 360 days after the notice to proceed.
• Scope includes demolition of existing culverts, installation of new culverts, asphalt pavement (hot‑mix), driveway tie‑ins (≤10 % grade), traffic‑control devices per MUTCD, and erosion‑control measures.
• Mandatory pre‑construction conference and weekly look‑ahead schedules; daily proof‑roll inspections required before paving.
• Contractor must provide bid bond (5 % of bid price), comply with SCDOT standards, maintain insurance, and submit required documentation (UBE certification, insurance certificates, etc.).
• Project budget not disclosed; estimated contract value likely in the low‑to‑mid millions based on similar county culvert‑replacement works.
• Submission deadline is November 10, 2026; a pre‑bid meeting (non‑mandatory) is scheduled for October 15, 2026.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.