Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Construction
  5. ›Fence Installation – Schuylkill River Trail Pottstown

Awarded contract·County of Montgomery·Pennsylvania

Fence Installation – Schuylkill River Trail Pottstown

Won by Abel Fence LLC$150kSingle Award
Contract source

Awarded vendors

  • Abel Fence LLC

Description

The contract is for the installation of a fence along the Schuylkill River Trail in Pottstown, PA. The scope of work includes supplying and installing approximately 3,755 feet of chain link fencing, with a 42" height and a 6" gap beneath the fence for vegetation management. The contractor is responsible for coordinating all work with the Regional Trail Manager, restoring the trail shoulder and surface to pre-construction conditions, and repairing any damage to the existing trail surface during installation. The contract also includes the supply and installation of black and brown coated fencing. • The fence shall be 9 gauge, vinyl coated chain link fence with 2” meshing. • The fence shall be 42” in height and include a 6” gap beneath the fence to allow for vegetation management. • The contractor shall utilize approximately 2” line posts, 1 5/8” top rails, and 2 ½” ends/corners. • All ends, corners, posts, rails, and other hardware should be colored to match the fence. • All posts should be concreted in place.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
6377

Contract value

$150,000

The contract value can be estimated based on the scope of work, which includes the installation of approximately 3,755 feet of chain link fencing. The cost of materials and labor for this type of project can vary, but a rough estimate for the total contract value could be around $100,000 to $200,000. This is a rough estimate and the actual value may be higher or lower, depending on various factors such as the complexity of the project, the location, and the contractor's rates.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Pennsylvania Game Commission·Pennsylvania

Top match · 69%

23WHM FY26 Deer Fence NE-B

Closes 11/3/2026Opened 10/19/2026

Connecticut Town of Simsbury·Connecticut

68% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Cobb County·Georgia

68% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Massachusetts Town of West Springfield·Massachusetts

67% match

Interstate Water Tank Fencing

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of Transportation·New Jersey

67% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026

Texas Parks & Wildlife Department·Texas

66% match

Fence Installation at Big Lake Bottom Wildlife Management Area (WMA)

Closes 11/10/2026Opened 10/26/2026

City of Gainesville - Procurement Division·Florida

66% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Georgia Cobb County Department of Transportation·Georgia

66% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

City of Middletown·Connecticut

66% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

66% match

Provide Guard Tower & Lower Perimeter Fence Modifications

Closes 11/18/2026Opened 9/23/2026

County of Fairfax·Virginia

65% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

City of Cincinnati·Ohio

65% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Danville·Virginia

65% match

IFB-26-27-031-Riverfront Park Guardrail and Fence Improvements

Closes 11/17/2026Opened 10/27/2026

County of Chester·Pennsylvania

65% match

Struble Trail Extension to Marsh Creek State Park

Closes 11/4/2026Opened 9/25/2026

Open Space Institute·South Carolina

65% match

The Meadows Boardwalk Trail Project

Closes 11/13/2026Opened 10/23/2026

Open Space Institute·South Carolina

65% match

The Meadows Boardwalk Trail Project

Closes 11/16/2026Opened 10/27/2026

Open Space Institute·South Carolina

64% match

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

Georgia Cobb County Department of Transportation·Georgia

64% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

Maryland Department of Natural Resources·Maryland

64% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

City of Cincinnati·Ohio

64% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Town of Chittenden·Vermont

64% match

Guardrail Replacement

Closes 11/19/2026Opened 10/16/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Provide Guard Tower & Lower Perimeter Fence Modifications – Groveland Correctional Facility (Project #47463)

Closes 11/18/2026Opened 9/23/2026

City of Green Cove Springs·Florida

64% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Camden County·New Jersey

64% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Maryland Department Of General Services·Maryland

64% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026