Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Hartford Water Pollution Control Facility Site Entrance…

Awarded contract·The Metropolitan District·Connecticut

Hartford Water Pollution Control Facility Site Entrance and Security Improvements Project

Won by L. Holzner Electric$1.3MAwarded 6/30/2017Single Award
Contract source

Awarded vendors

  • L. Holzner Electric

Description

This contract involves the design‑build of entrance and security upgrades for the Hartford Water Pollution Control Facility. The scope covers new pavement, entrance and parking areas, signage, a control booth, cantilever gate frames, fencing, an LED plant sign, electrical and instrumentation upgrades, lighting, security cameras, and card‑access systems for gates and the control booth. All labor, equipment, permits, and related costs required to complete the construction are included, and the work must comply with Section 01010 Summary of Work and applicable Connecticut statutes. The project requires a pre‑bid conference and a mandatory 10 % bid security. • Site improvements include parking, gates, fencing, and signage. • Security upgrades encompass cameras, lighting, and card‑access control. • Electrical and instrumentation work integrates new LED signage and control‑booth systems.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
4/11/2017
Intent to award
6/30/2017
Awarded
6/30/2017

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
2017B-07

Contract value

$1,250,490

The award record shows a Lump Sum Unit Price Override of $1,250,490 for L. Holzner Electric, which is effectively the contract’s award amount. Assuming no major change orders, the contract value is approximately $1.25 million. This estimate aligns with the scope (site entrance, parking, fencing, lighting, security systems) typical for a mid‑size municipal infrastructure upgrade.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

The Metropolitan Water District of Southern California·California

Top match · 68%

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

Georgia City of Hephzibah·Georgia

67% match

Addition to Existing Water Pollution Control Plan

Closes 11/5/2026Opened 9/28/2026

Barnet Fire District No. 2·Vermont

67% match

Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation

Closes 12/3/2026Opened 10/28/2026

Connecticut Dept. of Correction·Connecticut

66% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

Connecticut Cromwell Fire District·Connecticut

66% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Department of Buildings & General Services·Vermont

66% match

Mt. Ascutney State Park - South Wastewater System Improvements

Closes 11/13/2026Opened 10/21/2026

Connecticut Cromwell Fire District·Connecticut

66% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

City of Clearwater·Florida

66% match

Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings

Closes 12/16/2026Opened 10/28/2026

City of Charlotte·North Carolina

66% match

University Pond Water Quality Enhancement Project

Rolling / TBD closeOpened 5/14/2026

City of Cleveland·Ohio

66% match

117-26 - Dearborn Ave. - West 82nd Street - Berry Ave.

Closes 11/18/2026Opened 10/22/2026

Village of Wellington·Florida

66% match

Water Reclamation Facility Sodium Hydroxide Storage Area Modifications

Closes 11/18/2026Opened 10/16/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Connecticut UConn Health Center·Connecticut

66% match

Snow Removal and Ice Control Services for 65 Kane St. West Hartford

Closes 11/2/2026Opened 10/2/2026

Connecticut Town of South Windsor·Connecticut

66% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

Connecticut Town of Old Saybrook·Connecticut

65% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

Connecticut Town of Naugatuck·Connecticut

65% match

FY27-B142

Closes 2/26/2027Opened 10/7/2026

Virginia Polytechnic Institute and State University·Virginia

65% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Connecticut YWCA Hartford Region·Connecticut

65% match

YWCA Hartford Region – Drywall & Specialties

Closes 12/1/2026Opened 10/29/2026

City of Casper·Wyoming

65% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Mississippi Department of Finance and Administration·Mississippi

65% match

Wastewater Facility Improvements (Sanitary Sewer) (GS# 101-309)

Closes 11/19/2026Opened 10/20/2026

Connecticut UConn Health Center·Connecticut

65% match

Snow Removal and Ice Control Services for 65 Kane St. West Hartford

Closes 11/2/2026Opened 10/2/2026

Town of Cutler Bay·Florida

65% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

Virginia Polytechnic Institute and State University·Virginia

65% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

Town of Glastonbury·Connecticut

65% match

Sewage Sludge & Wastewater Hauling and Disposal

Closes 11/10/2026Opened 10/23/2026

Connecticut Dept. of Correction·Connecticut

65% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026