The City of Keene is seeking a contractor to replace approximately 1,726 linear feet of existing 10” AC sewer main with 12” PVC SDR-35 pipe and install additional 715 linear feet of 12” PVC SDR-35 pipe to reroute the sewer main into the existing 18” AC sewer interceptor on Ridgewood Ave. The project also includes removing thirteen existing sewer manholes and replacing them with eight new precast reinforced concrete manholes, and replacing twenty-nine existing residential sewer services from the sewer main up to the property line with new 4” PVC SDR-35 pipe and cleanouts. The engineer's estimate for the project is $900,000.00.
• The project involves sewer main replacement and installation of new pipes and manholes.
• The project requires the replacement of residential sewer services.
• The engineer's estimate for the project is $900,000.00.
• The contract was awarded to S.U.R. Construction West, Inc. for $800,800.00.